IAEA Announces Power Repair for ZNPP
ZNPP relied on diesel generators since September 23, with Russian forces disconnecting it from Ukraine's grid.
Repair plan includes 1.5-km ceasefire zones for Dniprovska (750kV) and Ferrosplavna-1 (330kV) lines.
Restoring off-site power is essential for reactor and spent fuel cooling.
Delays occurred due to safety guarantees from Ukraine and Russia ensuring repair safety.